Recycling!

After a hard weekend of infiltration bed building the first bed is operational! Ca 20 m³ of sand(0-8) mixed with peat on top of the EPDM rubber and drainage pipes. 15 cm below the surface are 4 pipes that spreads the water which then infiltrates to the bottom and is collected by the drainage pipes. […]